Suitability
See the available suitability statuses for information management documents.
- Select Information records from your project or portfolio settings.
- Select Suitability.
Suitability codes
The suitability status defines the purpose of the document uploaded to ProjectSight. This can be for a work in progress, construction, a client requirement, or other reasons. The option you chose in the Suitability status field determines the workflow of the document.
You can add or remove suitability codes or change the name and description of current codes.
| Name | Description | Details |
|---|---|---|
| S0 | Work in Progress | The information is in a private, non-shared state and used for internal development. It is not visible or accessible to other project teams. |
| S1 | Suitable for Coordination | The information has been checked by the originator and is now shared for the purpose of coordination with other teams. It is not approved for construction or contractual submission. |
| S2 | Suitable for Information | The information has been checked and is now shared with other parties for information purposes only, as defined within the appointment. This is often used for a contractual deliverable at a key stage gate. |
| S3 | Suitable for Review and Comment | The information is shared specifically to be reviewed and commented on by other parties, typically within a defined timeframe. |
| S4 | Suitable for Construction | The information has been reviewed and authorized as suitable for use in construction, manufacturing, or fabrication. This is a critical status change, often termed "going live." |
| AR | Archived | A record of information that was previously published but has now been superseded by a later revision. It is retained for the project record. |
| CR | Client Requirement | This code is reserved for use as defined within the client's specific information requirements. Its meaning must be clearly documented in the project's information standard. |