Information Management

Use the Information Management module to reduce manual errors and ensure compliance. The module automates document control, creating an unchangeable auditable trail for safety and contractual obligations.

Note: The Information Management module is only available in Europe, Australia, and New Zealand.

To see the Information Management module, select Information Management from the Project menu.

Select a folder to see any documents related to that folder. ProjectSight displays the related documents, including the name, the user that submitted the document, its status and suitability. You can view the documents in a tile view or grid view.

Use the Search bar to find specific documents.

Select a document to see its properties or workflow in the right pane.

Name your document

Administrators can enforce a standardized naming convention, such as ISO 19650, for the Information management module. these conventions use free text, lists, and fixed value components.

The module understand the ISO 19650 naming convention, which guides how to name your documents. Any information after the naming convention is used by ProjectSight to enter any details about the document.

For a document named: PR1-TRMB-ZZ-00-DR-A-061-Roof Plan_P01_S2.pdf

IdentifiersUse
PR1A unique code identifying the project
TRMBA code for the organization of the project that created the file
ZZThe functional breakdown of the project (for example, SD for schematic design or CD for construction documentation)
00The project spacial breakdown (for example, GF for ground floor or B1 for basement)
DRA form representing the type of information (for example, DR for drawing or M3 for a 3D model)
AThe code for the discipline responsible for the information (for example, A for architect or S for structural engineer)
061A sequential number to ensure the file name is unique

Information following the code is the document’s metadata and is used to populate the description, version, and suitability of the record. The version and suitability are required in order to submit the document. The suitability status determines the workflow of the document.

MetadataUse
Roof PlanThe record description
P01Revision version
S2Suitability